PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed Sanitary piping at the 1st floor going into the 2nd floor bathroom 242-244 Facing North.jpg Installed sprinkler branches at the 1st floor Facing West.jpg Installed temporary protection at the South Elevation.jpg Installing sprinkler pipes at the 1st floor Facing North.jpg Metal rack for the electrical equipment at the 2nd floor Facing West.jpg
Next page Installed Sanitary piping at the 1st floor going into the 2nd floor bathroom 242-244 Facing North
Installed Sanitary piping at the 1st floor going into the 2nd floor bathroom 242-244 Facing North